Search
Close this search box.

HydraShell™ MAX Installation

Step 1: Lay out horizontally on the eave, printed side up, with 3” horizontal laps and 6” vertical laps.

Step 2: Fasten with 1” diameter plastic cap roofing nails or staples, according to pre-printed nail pattern.

Marco Industries